Azovstal Iron and Steel Plant, Ukraine
Process control systems and automated monitoring systems for electric drives of generic circulating cycle.
• Roller conveyors modernization, installation of frequency converters and replacement of electric motors by more advanced models.
• Rolling mill automation. Development and implementation of the self-adaptive systems for regulating the thickness of the gauge of plate in the continuous hot and cold rolling mills.
Chervonodonetskaya Booster Compressor Station, Ukraine
Implementation of the control and monitoring system for gas air cooling operations, modernization of air coolers' drives, converter equipment installation.
Yulievka Booster Compressor Station, Ukraine
Supply of components and processing equipment
Kulan CS-4 Compressor Station, "Kazakhstan — China" gas-main pipeline, Kazakhstan
• Automation of gas-compressor unit modes, project development and equipment supply
• Vibrodiagnostic works on units.
Taldy CS-13 Compressor Station, Kazakhstan
• Adjustment of the automatic monitoring and regulation systems of gas-compressor units
• Automation of holding pumps modes in the seals of the "gas-oil" system.
Shelek CS-7 Compressor Station, "Kazakhstan — China" gas-main pipeline, Kazakhstan
• Feasibility study, project development and commissioning of UPS system for gas-turbine plant
• Process control system for oil air coolers. Project development, equipment supply, commissioning.
Bozoi and Akbulak Gas Measuring Stations, Kazakhstan
• Project development, installation of gas consumption gauge by RMG production
• Supply and commissioning of UPS system for measuring unit
• Debugging of data-collecting and archiving systems, as well as data-sending system
Makat Compressor Station, Kazakhstan
Increasing capacities of the existing compressor station, its modernization and compressor equipment supply.
Kenkiyak deposit, Kazakhstan
Preventive tests and regime-adjustment works on the self-contained utility systems. Deposit improvement, introduction of energy-saving technologies and alternative power.
Atyrau Refinery Reconstruction, Kazakhstan
Introduction of process control system based on microtechnology.
Construction of the advanced oil processing complex at the Atyrau Refinery, Kazakhstan
Adaptation of Octanizing (reforming with continuous catalyst regeneration) and R2R (catalytic cracking of residuum in a fluidized bed) fuel producing technologies by Axens.
Pavlodar Petrochemical Plant modernization, Kazakhstan
• Replacement of outdated measuring instruments
• Modernization of signaling systems, interlocks and emergency protection of LK-6U, KT-1 and AGU compressor units
• Introduction of automated dispatch control system for power supply.
SKZ-U Sulfate Plant, Kazakhstan
Introduction of automated control and management systems for the steam turbine generators' modes by General Elektric (France) with the Termodyn turbine included in the energy complex.
Balkhash Mining and Metallurgical Plant, Kazakhstan
Comprehensive production automation.
Pavlodar Aluminum Plant, Kazakhstan
Upgrade of process control system of bauxite milling area.
Akhangarani tsemenditehas
Türistori käivitusseade sünkroonsete elektrimootorite tarnimiseks ja palliveski juhtimiseks.
Bagtyyarlyk deposit, Turkmenistan
• Feasibility study for the construction of gas-cleaning plants for the CNPC Chinese company
• Increasing capacities of the existing compressor station.
Malay Deposit Compressor Station, Turkmenistan
Development and introduction of automated control system of three DR61 gas-compressor units by Dresser-Rand SA with LM2500 gas generator (GE).
Gas drier installation in Bagtyyarlyk-2, Turkmenistan
Equipment installation control: 18 adsorbers (A-1), three sets of separators (C-1), three sets of gas filters (FS-1), three sets of buffer tanks with E-1 separator, as well as three sets of furnace blocks (P-1).
Gas drier installation, Deryalyk Compressor Station, Turkmenistan
Adjustment of automatic control and regulation systems of GPA-TS1-16S/76-1,5 gas pumping units.
Yylanly Compressor Station, Turkmenistan
Providing GPA-TS1-16S/76-1,5 gas pumping units with automatic control system including blow-off control.
Belek Compressor Station, Turkmenistan
Automation of air coolers operations. Adjustment of monitoring and dispatching systems.
Dovletabat-3 Compressor Station, Dovletabat deposit, Turkmenistan
Upgrade of the remote control system. Introduction of the vibrational state control of turbine unit.
Cholluk Compressor Station, Turkmenistan
Compressor station automatic control system reconstruction. Process piping reconstruction.
Turkmenbashi complex of oil refineries, Turkmenistan
Reconstruction and modernization of automated control system for seawater desalination plant. Participation in the construction and commissioning the electric desalting plant (EDP).
Mazeikiai Refinery, Lithuania
Automated control system introduction